Project Completion Certificate (Ground Water)
Scheme ID: 20033880 Name of Scheme: Toniya Mafi W/S Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1270 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-Jun-2024 Actual Date of Completion (Capex): 10-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 27.02 Mtr/ 127 M Toniya Mafi 28.372835 78.173151
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 7.5 HP Submersible Pump 17.4 cum / 44 M Toniya Mafi 28.372835 78.173151
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 75 KL/ 12 M Toniya Mafi 28.372835 78.173151
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 80 0.03898
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.1543
2 HDPE Pipe PN-6: Class PE-100 75 0.2936
3 HDPE Pipe PN-6: Class PE-100 63 3.356
4 HDPE Pipe PN-6: Class PE-100 110 0.2433
5 HDPE Pipe PN-6: Class PE-100 140 0.0936
HSC Connection
Sno. Total Nos.
1 200
Other Details
1.17
1.27
1.27
10-Apr-2024
11-Apr-2024