| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20034199 | Name of Scheme: DARIYAPUR WSS GOV | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 5529 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 02-Aug-2024 | Actual Date of Completion (Capex): 05-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 20.10 M / 67.33 M | DARIYAPUR | 28.4222732 | 77.7939524 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUMERSIBLE | 1100 LPM / 52 M | DARIYAPUR | 28.4222732 | 77.7939524 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 325 KL / 16 M | DARIYAPUR | 28.4223876 | 77.7940533 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.022 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.784 | |
| 2 | HDPE | 75 | 0.473 | |
| 3 | HDPE | 90 | 0.275 | |
| 4 | HDPE | 110 | 0.311 | |
| 5 | HDPE | 125 | 0.040 | |
| 6 | HDPE | 140 | 0.134 | |
| 7 | HDPE | 160 | 0.096 | |
| 8 | HDPE | 180 | 0.103 | |
| 9 | HDPE | 200 | 0.573 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 685 |