| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20034270 | Name of Scheme: Kharawa water supply scheme | No. of Villages: 2 | No. of Habitation Covered: 8 |
| Total Population Covered: 3349 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 06-May-2024 | Actual Date of Completion (Capex): 09-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | PLAIN PIPE 300MM | 51 | KHARAWA | 26.571384 | 81.370205 |
| 2 | SLOTTED PIPE 300MM | 16 | KHARAWA | 26.571384 | 81.370205 |
| 3 | PLAIN PIPE 150MM` | 16.5 | KHARAWA | 26.571384 | 81.370205 |
| 4 | SLOTTED PIPE 150MM | 3 | KAHARAWA | 26.571384 | 81.370205 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 700LPM | KHARAWA | 26.571384 | 81.370205 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 400KL/16MTR | KHARAWA | 26.571384 | 81.370205 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | .043 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 1.529 | |
| 2 | HDPE PIPE | 75 | .554 | |
| 3 | HDPE PIPE | 63 | 7.732 | |
| 4 | HDPE PIPE | 110 | .347 | |
| 5 | HDPE PIPE | 125 | .829 | |
| 6 | HDPE PIPE | 160 | .610 | |
| 7 | HDPE PIPE | 180 | .296 | |
| 8 | HDPE PIPE | 200 | .063 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 580 |