Project Completion Certificate (Ground Water)
Scheme ID: 20034270 Name of Scheme: Kharawa water supply scheme No. of Villages: 2 No. of Habitation Covered: 8
Total Population Covered: 3349 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-May-2024 Actual Date of Completion (Capex): 09-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 PLAIN PIPE 300MM 51 KHARAWA 26.571384 81.370205
2 SLOTTED PIPE 300MM 16 KHARAWA 26.571384 81.370205
3 PLAIN PIPE 150MM` 16.5 KHARAWA 26.571384 81.370205
4 SLOTTED PIPE 150MM 3 KAHARAWA 26.571384 81.370205
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 700LPM KHARAWA 26.571384 81.370205
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 400KL/16MTR KHARAWA 26.571384 81.370205
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 .043
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 1.529
2 HDPE PIPE 75 .554
3 HDPE PIPE 63 7.732
4 HDPE PIPE 110 .347
5 HDPE PIPE 125 .829
6 HDPE PIPE 160 .610
7 HDPE PIPE 180 .296
8 HDPE PIPE 200 .063
HSC Connection
Sno. Total Nos.
1 580
Other Details
3.03
3.03
2.96
15-Sep-2024
11-Nov-2024