Project Completion Certificate (Ground Water)
Scheme ID: 20034273 Name of Scheme: BANIPARA JINAI No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2960 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 10/69.62 Banipara Jinai 26.548496 79.864995
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 56.5/57 Banipara Jinai 26.548496 79.864995
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/12 Banipara Jinai 26.548496 79.864995
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 150 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.100
2 HDPE 75 2.500
3 HDPE 90 1.436
4 HDPE 110 0.498
5 HDPE 140 0.506
6 HDPE 160 0.635
7 HDPE 180 0.307
HSC Connection
Sno. Total Nos.
1 477
Other Details
2.19
2.42
2.42
09-Feb-2024
01-Mar-2024