Project Completion Certificate (Ground Water)
Scheme ID: 20034278 Name of Scheme: KADARI No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1600 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 31-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18/75.52 Kadari 26.56097 79.981801
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.130 Actual
2 HDPE 75 1.151 Actuals
3 HDPE 90 0.261 Actuals
4 HDPE 110 0.150 Actuals
5 HDPE 140 0.071 Actuals
HSC Connection
Sno. Total Nos.
Other Details
1.46
1.64
1.64
30-Oct-2023
01-Nov-2023