Project Completion Certificate (Ground Water)
Scheme ID: 20034279 Name of Scheme: KAILAI No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1960 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 15/272.50 Kailai 26.56097 79.981801
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 21.90/60 Kailai 26.56097 79.981801
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 Kailai 26.56097 79.981801
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.184 Actuals
2 HDPE 75 0.235 Actuals
3 HDPE 90 0.122 Actuals
4 HDPE 110 0.605 Actuals
5 HDPE 140 0.123 Actuals
6 HDPE 160 0.326 Actuals
HSC Connection
Sno. Total Nos.
Other Details
1.59
1.73
1.72
31-May-2023
01-Jun-2023