Project Completion Certificate (Ground Water)
Scheme ID: 20034280 Name of Scheme: GAHLOO No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2210 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Nov-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.402
2 HDPE 75 0.040
3 HDPE 90 0.143
4 HDPE 110 0.289
5 HDPE 126 0.046
6 HDPE 140 0.329
7 HDPE 160 1.810
8 HDPE 180 0.520
HSC Connection
Sno. Total Nos.
Other Details
1.79
1.91
1.91
18-Apr-2024
01-May-2024