Project Completion Certificate (Ground Water)
Scheme ID: 20034282 Name of Scheme: BHAISAYNA No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 5000 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 15.53 Actuals
2 HDPE 75 0.860 Actuals
3 HDPE 90 0.875 Actuals
4 HDPE 110 1.075 Actuals
5 HDPE 125 0.630 Actuals
6 HDPE 140 0.328 Actuals
7 HDPE 180 0.205 Actuals
HSC Connection
Sno. Total Nos.
Other Details
2.89
3.38
3.38
30-Jun-2023
01-Jul-2023