Project Completion Certificate (Ground Water)
Scheme ID: 20034283 Name of Scheme: KORAUWA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2600 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.5 Actuals
2 HDPE 75 1.495 Actuals
3 HDPE 90 0.814 Actuals
4 HDPE 110 0.538 Actuals
5 HDPE 140 0.025 Actuals
6 HDPE 160 0.215 Actuals
HSC Connection
Sno. Total Nos.
Other Details
1.62
1.87
1.87
31-May-2023
01-Jun-2023