Project Completion Certificate (Ground Water)
Scheme ID: 20034284 Name of Scheme: JALALPUR NAGIN No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 4790 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Nov-2022 Actual Date of Completion (Capex): 23-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8177
2 HDPE 75 2319
3 HDPE 90 863
4 HDPE 110 1973
5 HDPE 140 1886
6 HDPE 160 1797
7 HDPE 180 334
8 HDPE 200 461
HSC Connection
Sno. Total Nos.
Other Details
3.34
3.85
3.85
31-Jul-2023
01-Aug-2023