Project Completion Certificate (Ground Water)
Scheme ID: 20034287 Name of Scheme: BILSARAYAN No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2630 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Nov-2022 Actual Date of Completion (Capex): 23-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5322.50
2 HDPE 75 639
3 HDPE 90 385
4 HDPE 110 613
5 HDPE 140 589
6 HDPE 160 828
HSC Connection
Sno. Total Nos.
Other Details
1.76
2.00
2.00
31-Jan-2024
01-Feb-2024