Project Completion Certificate (Ground Water)
Scheme ID: 20034288 Name of Scheme: KAUSUM No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3180 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Nov-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.345 As per Site
2 HDPE 75 0.237 As per Site
3 HDPE 90 0.082 As per Site
4 HDPE 110 2.113 As per Site
5 HDPE 140 0.463 As per Site
6 HDPE 160 0.301 As per Site
HSC Connection
Sno. Total Nos.
Other Details
1.92
2.43
2.43
30-Nov-2023
01-Dec-2023