Project Completion Certificate (Ground Water)
Scheme ID: 20034292 Name of Scheme: RAMPUR KUKHAT No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3600 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Nov-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.350 As Per Site
2 HDPE 75 0.410 As Per Site
3 HDPE 90 0.371 As Per Site
4 HDPE 110 0.645 As Per Site
5 HDPE 140 0.127 As Per Site
6 HDPE 160 0.256 As Per Site
7 HDPE 180 0.042 As Per Site
HSC Connection
Sno. Total Nos.
Other Details
2.15
2.36
2.36
30-Jun-2023
01-Jul-2023