Project Completion Certificate (Ground Water)
Scheme ID: 20034318 Name of Scheme: Mahaiya Senduriya water supply scheme No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 5499 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-May-2024 Actual Date of Completion (Capex): 16-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 PLAIN PIPE 300MM 68 MAHIYA SINDURIYA 26.520033 81.38389
2 SLOTTED PIPE 300MM 17 MAHIYA SINDURIYA 26.520033 81.38389
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 600 MAHIYA SINDURIYA 26.520033 81.38389
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 350KL/18MTR MAHIYA SINDURIYA 26.520033 81.38389
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 1.01
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 2.077
2 HDPE PIPE 75 1.468
3 HDPE PIPE 63 13.122
4 HDPE PIPE 110 2.626
5 HDPE PIPE 125 .598
6 HDPE PIPE 140 .018
7 HDPE PIPE 160 1.935
8 HDPE PIPE 180 1.366
9 HDPE PIPE 200 .060
HSC Connection
Sno. Total Nos.
1 1002
Other Details
5.89
0.00
5.87
19-Sep-2024
26-Nov-2024