Project Completion Certificate (Ground Water)
Scheme ID: 20034320 Name of Scheme: Saimbasi & Sangrampur water supply scheme No. of Villages: 2 No. of Habitation Covered: 8
Total Population Covered: 4189 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Aug-2024 Actual Date of Completion (Capex): 23-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 243.8 Saimbasi & Sangrampur 26.313482 81.484278
2 300MM PLAIN PIPE 66 Saimbasi & Sangrampur 26.313482 81.484278
3 150MM SLOTTED PIPE 21 Saimbasi & Sangrampur 26.313482 81.484278
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE PUMP 900 LPM / 56 M Saimbasi & Sangrampur 26.313482 81.484278
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275 KL/ 18M Saimbasi & Sangrampur 26.313482 81.484278
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 30.7
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE (63-200) 200 20.453
HSC Connection
Sno. Total Nos.
1 660
Other Details
4.51
0.00
4.49
23-Jun-2024
01-Jan-2025