Project Completion Certificate (Ground Water)
Scheme ID: 20034329 Name of Scheme: PAKARGAON WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 13
Total Population Covered: 10120 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 07-Dec-2024 Actual Date of Completion (Capex): 11-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150 MMØ Plain Pipe 71.10 PAKARGAON 26.368498 81.449358
2 300 MMØ Plain Pipe 115 PAKARGAON 26.368498 81.449358
3 150 MMØ Slotted Pipe 20.00 PAKARGAON 26.368498 81.449358
4 300 MMØ Slotted Pipe 27 PAKARGAON 26.368498 81.449358
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible Pump 850 LPM/56 M PAKARGAON 26.368498 81.449358
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 500 KL/18 M PAKARGAON 26.368498 81.449358
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.668
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 4.055
2 HDPE PIPE 75 3.038
3 HDPE PIPE 63 16.979
4 HDPE PIPE 110 3.182
5 HDPE PIPE 125 2.782
6 HDPE PIPE 140 1.396
7 HDPE PIPE 160 1.595
8 HDPE PIPE 180 1.699
9 HDPE PIPE 200 0.745
HSC Connection
Sno. Total Nos.
1 1460
Other Details
8.32
0.00
8.14
21-Aug-2024
05-Dec-2024