| Scheme ID: 20034329 | Name of Scheme: PAKARGAON WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 13 |
| Total Population Covered: 10120 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 07-Dec-2024 | Actual Date of Completion (Capex): 11-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150 MMØ Plain Pipe | 71.10 | PAKARGAON | 26.368498 | 81.449358 |
| 2 | 300 MMØ Plain Pipe | 115 | PAKARGAON | 26.368498 | 81.449358 |
| 3 | 150 MMØ Slotted Pipe | 20.00 | PAKARGAON | 26.368498 | 81.449358 |
| 4 | 300 MMØ Slotted Pipe | 27 | PAKARGAON | 26.368498 | 81.449358 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Sumersible Pump | 850 LPM/56 M | PAKARGAON | 26.368498 | 81.449358 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 500 KL/18 M | PAKARGAON | 26.368498 | 81.449358 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.668 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 4.055 | |
| 2 | HDPE PIPE | 75 | 3.038 | |
| 3 | HDPE PIPE | 63 | 16.979 | |
| 4 | HDPE PIPE | 110 | 3.182 | |
| 5 | HDPE PIPE | 125 | 2.782 | |
| 6 | HDPE PIPE | 140 | 1.396 | |
| 7 | HDPE PIPE | 160 | 1.595 | |
| 8 | HDPE PIPE | 180 | 1.699 | |
| 9 | HDPE PIPE | 200 | 0.745 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1460 |