Project Completion Certificate (Ground Water)
Scheme ID: 20034330 Name of Scheme: FATEPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 6345 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-May-2024 Actual Date of Completion (Capex): 09-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MS PIPE 123.8 M / 42M FATEPUR 26.462973 81.498585
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 650 LPM/ 56M FATEPUR 26.462973 81.498585
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 375 KL/ 18M FATEPUR 26.462973 81.498585
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 0.467
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63MM TO 200MM 200 21.094
HSC Connection
Sno. Total Nos.
1 1157
Other Details
5.96
0.00
5.95
12-Feb-2026
20-May-2026