Project Completion Certificate (Ground Water)
Scheme ID: 20034332 Name of Scheme: Bhaghirathpur water supply scheme No. of Villages: 1 No. of Habitation Covered: 12
Total Population Covered: 4083 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Apr-2025 Actual Date of Completion (Capex): 05-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150 MM PLAIN PIPE 10.30 Bhaghirathpur 26.316492 81.530174
2 300 MM PLAIN PIPE 53.00 Bhaghirathpur 26.316492 81.530174
3 150 MM SLOTTED PIPE 18.00 Bhaghirathpur 26.316492 81.530174
4 300 MM SLOTTED PIPE 4.0 Bhaghirathpur 26.316492 81.530174
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE PUMP 700 LPM/54 M Bhaghirathpur 26.316492 81.530174
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 KL / 16 M Bhaghirathpur 26.316492 81.530174
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0165
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 1.75
2 HDPE PIPE 63 9.92
3 HDPE PIPE 110 3.10
4 HDPE PIPE 160 1.75
5 HDPE PIPE 180 0.083
HSC Connection
Sno. Total Nos.
1 732
Other Details
3.56
0.00
3.56
10-Dec-2024
14-Mar-2025