Project Completion Certificate (Ground Water)
Scheme ID: 20034334 Name of Scheme: Jainagara water supply scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1850 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Nov-2024 Actual Date of Completion (Capex): 02-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200 MM PLAIN PIPE 64 JAINAGRA 26.482613 81.480861
2 200MM SLOTTED PIPE 18 JAINAGRA 26.482613 81.480861
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 500 JAINAGRA 26.482613 81.480861
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 150KL/14MTR JAINAGRA 26.482613 81.480861
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 .021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 2.356
2 HDPE PIPE 75 .539
3 HDPE PIPE 63 4.744
4 HDPE PIPE 110 .095
5 HDPE PIPE 125 .070
6 HDPE PIPE 160 .728
7 HDPE PIPE 180 .010
HSC Connection
Sno. Total Nos.
1 377
Other Details
2.42
0.00
2.39
05-Sep-2024
10-Dec-2024