Project Completion Certificate (Ground Water)
Scheme ID: 20034335 Name of Scheme: AHMEDABADH PIPARI & DHIRAPUR WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 6
Total Population Covered: 7128 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 13-Mar-2025 Actual Date of Completion (Capex): 07-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 114.60 AHMEDABADH PIPARI & DHIRAPUR 26.499211 81.495257
2 300MM PLINE PIPE 113.50 AHMEDABADH PIPARI & DHIRAPUR 26.499211 81.495257
3 150MM SLOTTED PIPE 15 AHMEDABADH PIPARI & DHIRAPUR 26.499211 81.495257
4 300MM SLOTTED PIPE 32 AHMEDABADH PIPARI & DHIRAPUR 26.499211 81.495257
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE PUMP 600 LPM/ 54 M AHMEDABADH PIPARI & DHIRAPUR 26.499211 81.495257
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350 KL / 16M AHMEDABADH PIPARI & DHIRAPUR 26.499211 81.495257
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.468
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 1.121
2 HDPE PIPE 75 1.358
3 HDPE PIPE 63 14.213
4 HDPE PIPE 110 0.362
5 HDPE PIPE 125 2.130
6 HDPE PIPE 140 0.370
7 HDPE PIPE 160 1.872
8 HDPE PIPE 200 0.752
HSC Connection
Sno. Total Nos.
1 906
Other Details
5.86
0.00
5.84
10-Dec-2024
14-Mar-2025