| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20034335 | Name of Scheme: AHMEDABADH PIPARI & DHIRAPUR WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 6 |
| Total Population Covered: 7128 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 13-Mar-2025 | Actual Date of Completion (Capex): 07-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150MM PLAIN PIPE | 114.60 | AHMEDABADH PIPARI & DHIRAPUR | 26.499211 | 81.495257 |
| 2 | 300MM PLINE PIPE | 113.50 | AHMEDABADH PIPARI & DHIRAPUR | 26.499211 | 81.495257 |
| 3 | 150MM SLOTTED PIPE | 15 | AHMEDABADH PIPARI & DHIRAPUR | 26.499211 | 81.495257 |
| 4 | 300MM SLOTTED PIPE | 32 | AHMEDABADH PIPARI & DHIRAPUR | 26.499211 | 81.495257 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUMERSIBLE PUMP | 600 LPM/ 54 M | AHMEDABADH PIPARI & DHIRAPUR | 26.499211 | 81.495257 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 350 KL / 16M | AHMEDABADH PIPARI & DHIRAPUR | 26.499211 | 81.495257 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.468 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 1.121 | |
| 2 | HDPE PIPE | 75 | 1.358 | |
| 3 | HDPE PIPE | 63 | 14.213 | |
| 4 | HDPE PIPE | 110 | 0.362 | |
| 5 | HDPE PIPE | 125 | 2.130 | |
| 6 | HDPE PIPE | 140 | 0.370 | |
| 7 | HDPE PIPE | 160 | 1.872 | |
| 8 | HDPE PIPE | 200 | 0.752 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 906 |