Project Completion Certificate (Ground Water)
Scheme ID: 20034345 Name of Scheme: Uncha Gaon GP W/S Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3255 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 01-Feb-2024 Actual Date of Completion (Capex): 19-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30 / 99.35 Uncha Gaon 28.499810 79.019558
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.5 HP Submersible Pump 41.4 / 40 Uncha Gaon 28.49981 79.019558
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 200 / 12 Uncha Gaon 28.499813 79.019408
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 125 .023
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.587
2 HDPE Pipe PN-6: Class PE-100 90 75 0.664
3 HDPE Pipe PN-6: Class PE-100 90 63 2.915
4 HDPE Pipe PN-6: Class PE-100 90 110 0.195
5 HDPE Pipe PN-6: Class PE-100 90 140 0.104
6 HDPE Pipe PN-6: Class PE-100 90 160 0.248
HSC Connection
Sno. Total Nos.
1 548
Other Details
1.64
1.89
1.89
19-Jul-2024
20-Jul-2024