Project Completion Certificate (Ground Water)
Scheme ID: 20034611 Name of Scheme: DEVHAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 4470 Base Year: 2023 Intermediate Year: 2033 Design Year: 2053
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 15-Feb-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 30/62.8 Devhat 26°28'57.14"N 82°42'13.99"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump-1 57/44 Devhat 26°28'57.14"N 82°42'13.99"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC- Zink Alum 275/14 Devhat 26°28'57.14"N 82°42'13.99"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 .035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 19.692
2 HDPE Pipe PN-6: Class PE-100 75 1.244
3 HDPE Pipe PN-6: Class PE-100 90 1.619
4 HDPE Pipe PN-6: Class PE-100 110 1.647
5 HDPE Pipe PN-6: Class PE-100 140 0.426
6 HDPE Pipe PN-6: Class PE-100 180 0.16
HSC Connection
Sno. Total Nos.
1 600
Other Details
3.00
0.00
0.00
14-Aug-2026
15-Aug-2026