Project Completion Certificate (Ground Water)
Scheme ID: 20034823 Name of Scheme: ONDEEH RO WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2501 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Nov-2024 Actual Date of Completion (Capex): 11-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300 MM PLAIN PIPE 36.50 ONDEEH 26.330157 81.36902
2 300 MM SLOTTED PIPE 7 ONDEEH 26.330157 81.36902
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 550LPM / 53MTR ONDEEH 26.330157 81.396902
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 250KL / 15MTR ONDEEH 26.330157 81.396902
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 .041
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 .525
2 HDPE PIPE 75 .750
3 HDPE PIPE 63 6.16
4 HDPE PIPE 110 2.893
5 HDPE PIPE 180 .049
HSC Connection
Sno. Total Nos.
1 403
Other Details
2.51
0.00
2.39
11-Sep-2024
15-Dec-2024