Project Completion Certificate (Ground Water)
Scheme ID: 20034985 Name of Scheme: RAMAE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3002 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-May-2025 Actual Date of Completion (Capex): 21-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 SLOTTED PIPE 300 12 RAMAE 26.345442 81.448123
2 SLOTTED PIPE 150 6 RAMAE 26.345442 81.448123
3 PLAIN PIPE 300 58 RAMAE 26.345442 81.448123
4 PLAIN PIPE 150 33.3 RAMAE 26.345442 81.448123
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 650 RAMAE 26.345442 81.448123
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 RAMAE 26.345442 81.448123
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Rising Main 100 .0247
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 110 2.246
2 HDPE 63 12.1711
3 HDPE 140 1.3531
4 HDPE 160 2.5553
5 HDPE 180 .039
HSC Connection
Sno. Total Nos.
1 545
Other Details
3.30
0.00
3.30
24-Sep-2024
06-Nov-2024