| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20034985 | Name of Scheme: RAMAE WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 3002 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 06-May-2025 | Actual Date of Completion (Capex): 21-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | SLOTTED PIPE 300 | 12 | RAMAE | 26.345442 | 81.448123 |
| 2 | SLOTTED PIPE 150 | 6 | RAMAE | 26.345442 | 81.448123 |
| 3 | PLAIN PIPE 300 | 58 | RAMAE | 26.345442 | 81.448123 |
| 4 | PLAIN PIPE 150 | 33.3 | RAMAE | 26.345442 | 81.448123 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 650 | RAMAE | 26.345442 | 81.448123 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250 | RAMAE | 26.345442 | 81.448123 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Rising Main | 100 | .0247 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 110 | 2.246 | |
| 2 | HDPE | 63 | 12.1711 | |
| 3 | HDPE | 140 | 1.3531 | |
| 4 | HDPE | 160 | 2.5553 | |
| 5 | HDPE | 180 | .039 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 545 |