Scheme ID: 20035108 Name of Scheme: BASIA WSS No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 3680 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Nov-2023 Actual Date of Completion (Capex): 14-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell-1 18/84.54 Basia 26º 16' 35.899" N 82º 41' 47.817" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT- Pump-1 30/43 Basia 26º 16' 35.899" N 82º 41' 47.817" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum-OHT-1 150/12 Basia 26º 16' 35.899" N 82º 41' 47.817" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 7.173
2 HDPE Pipe PN-6: Class PE-100 75 2.004
3 HDPE Pipe PN-6: Class PE-100 90 1.231
4 HDPE Pipe PN-6: Class PE-100 110 0.583
5 HDPE Pipe PN-6: Class PE-100 140 0.893
6 HDPE Pipe PN-6: Class PE-100 160 0.191
HSC Connection
Sno. Total Nos.
1 278
Other Details
1.93
0.00
1.91
02-Dec-2024
03-Dec-2024