Scheme ID: 20035121 Name of Scheme: DHARMA MUBARAK PATTI WSS No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 4750 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 20-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 28.09/52.73 Dharma Mubarak Patti 26° 28' 53.17" N 82°28' 29.14E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 42/46 Dharma Mubarak Patti 26° 28' 53.17" N 82°28' 29.14E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC ZAT 200/14 Dharma Mubarak Patti 26° 28' 53.17" N 26° 28' 53.17" N
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI ???? ?-7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE ???? PN-6: Class ??-100 63 9.932
2 HDPE ???? PN-6: Class ??-100 75 2.163
3 HDPE ???? PN-6: Class ??-100 90 0.917
4 HDPE ???? PN-6: Class ??-100 110 0.876
5 HDPE ???? PN-6: Class ??-100 125 0.114
6 HDPE ???? PN-6: Class ??-100 140 0.223
7 HDPE ???? PN-6: Class ??-100 160 0.221
8 HDPE ???? PN-6: Class ??-100 180 0.441
HSC Connection
Sno. Total Nos.
1 576
Other Details
249.75
0.00
247.09
13-Oct-2025
14-Oct-2025