Project Completion Certificate (Ground Water)
Scheme ID: 20035147 Name of Scheme: SINJHAULIYA WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2850 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 14-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/77.5 SINJHAULIYA 26° 26' 48.5484'' N 82° 30' 12.6468'' E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 30/45 SINJHAULIYA 26° 26' 48.5484'' N 82° 30' 12.6468'' E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum 150/14 SINJHAULIYA 26° 26' 48.5484'' N 82° 30' 12.6468'' E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 5.898
2 HDPE Pipe PN-6: Class PE-100 75 2.089
3 HDPE Pipe PN-6: Class PE-100 90 0.188
4 HDPE Pipe PN-6: Class PE-100 110 0.684
5 HDPE Pipe PN-6: Class PE-100 125 0.162
6 HDPE Pipe PN-6: Class PE-100 140 0.181
7 HDPE Pipe PN-6: Class PE-100 160 0.274
HSC Connection
Sno. Total Nos.
1 534
Other Details
1.81
0.00
0.00
31-Mar-2026
01-Apr-2026