Project Completion Certificate (Ground Water)
Scheme ID: 20035148 Name of Scheme: SURJUPUR WSS No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 2910 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Oct-2023 Actual Date of Completion (Capex): 08-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 tubewell 18/86.81 surjupur 26O 29' 44.603" N 82º 25' 44.993" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 24/45 surjupur 26O 29' 44.603" N 82º 25' 44.993" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/14 surjupur 26O 29' 44.603" N 82º 25' 44.993" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 4.897
2 HDPE Pipe PN-6: Class PE-100 75 0.803
3 HDPE Pipe PN-6: Class PE-100 90 0.058
4 HDPE Pipe PN-6: Class PE-100 110 0.220
5 HDPE Pipe PN-6: Class PE-100 125 0.382
6 HDPE Pipe PN-6: Class PE-100 160 0.0531
HSC Connection
Sno. Total Nos.
1 306
Other Details
1.54
0.00
1.57
19-Mar-2025
20-Mar-2025