Project Completion Certificate (Ground Water)
Scheme ID: 20035177 Name of Scheme: PINDARA PARERA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 11
Total Population Covered: 4328 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 03-Nov-2024 Actual Date of Completion (Capex): 15-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 PLAIN PIPE 300MM 52 PINDARA 26°29'48.2 81°23'35.3
2 SLOTTED PIPE 300MM 14 PINDARA 26°29'48.2 81°23'35.3
3 PLAIN PIPE 150MM 56.30 PINDARA 26°29'48.2 81°23'35.3
4 SLOTTED PIPE 150MM 27.50 PINDARA 26°29'48.2 81°23'35.3
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 950 Pindara 26°29'48.2 81°23'35.3
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank 400KL / 18Mtr Pindara 26°29'48.2 26°29'48.2
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 150mm DI K-7 150 9.60
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 3548.60
2 HDPE 63 11337.90
3 HDPE 110 1848
4 HDPE 140 596
5 HDPE 160 650.90
6 HDPE 180 494.20
7 HDPE 200 1388.90
HSC Connection
Sno. Total Nos.
1 768
Other Details
4.08
0.00
4.06
20-Aug-2024
01-Dec-2024