Scheme ID: 20035268 Name of Scheme: HATHINARAJ WSS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 6270 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Oct-2022 Actual Date of Completion (Capex): 21-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell -1 27/69.8 Hathina Raj 26º 26' 57.204" N 82º 50' 35.033" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Sub. Pump 850 / 45 Hathina Raj 26º 26' 57.204" N 82º 50' 35.033" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC Zink Alum Tank 250 / 14 Hathina Raj 26º 26' 57.204" N 82º 50' 35.033" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6-PE-100 63 14.134
2 HDPE PN6-PE-100 75 5.861
3 HDPE PN6-PE-100 90 0.978
4 HDPE PN6-PE-100 110 2.169
5 HDPE PN6-PE-100 125 1.185
6 HDPE PN6-PE-100 160 0.032
HSC Connection
Sno. Total Nos.
1 520
Other Details
3.12
0.00
3.29
05-Dec-2024
06-Dec-2024