| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20035303 | Name of Scheme: AURANGABAD URF HUMYAUNPUR WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 790 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 20-Mar-2024 | Actual Date of Completion (Capex): 30-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24m/76m | AURANGABAD URF HUMYAUNPUR | 28.114079 | 77.673828 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERCIBLE | 200LPM/47M | AURANGABAD URF HUMYAUNPUR | 28.114079 | 77.673828 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 50KL/12M | AURANGABAD URF HUMYAUNPUR | 28.114079 | 77.673828 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 125 | 14 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.63 | |
| 2 | HDPE | 75 | 0.125 | |
| 3 | HDPE | 110 | .141 | |
| 4 | HDPE | 140 | 0.66 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 191 |