| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20035392 | Name of Scheme: PAHARIPUR KHIRIYA WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 6 |
| Total Population Covered: 2339 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 06-Jul-2024 | Actual Date of Completion (Capex): 03-Nov-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Plain Pipe | 61.31 | TW | 26.125086 | 83.754554 |
| 2 | Slotted Pipe | 5 | TW | 26.125086 | 83.754554 |
| 3 | Slotted Pipe | 3 | TW | 26.125086 | 83.754554 |
| 4 | Slotted Pipe | 12.03 | TW | 26.125086 | 83.754554 |
| 5 | Slotted Pipe | 6.02 | TW | 26.125086 | 83.754554 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Field master engineering | 500/45 | Pump House | 26.125086 | 83.754554 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/12 | OHT Campus | 26.125086 | 83.754554 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-7 | 100 | 0.05 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/PE100,PN-6 | 63 | 6.29 | |
| 2 | HDPE/PE100,PN-6 | 75 | 0.64 | |
| 3 | HDPE/PE100,PN-6 | 90 | 0.83 | |
| 4 | HDPE/PE100,PN-6 | 110 | 0.696 | |
| 5 | HDPE/PE100,PN-6 | 140 | 0.663 | |
| 6 | HDPE/PE100,PN-6 | 160 | 0.012 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 244 |