Project Completion Certificate (Ground Water)
Scheme ID: 20035392 Name of Scheme: PAHARIPUR KHIRIYA WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 2339 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Jul-2024 Actual Date of Completion (Capex): 03-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Plain Pipe 61.31 TW 26.125086 83.754554
2 Slotted Pipe 5 TW 26.125086 83.754554
3 Slotted Pipe 3 TW 26.125086 83.754554
4 Slotted Pipe 12.03 TW 26.125086 83.754554
5 Slotted Pipe 6.02 TW 26.125086 83.754554
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Field master engineering 500/45 Pump House 26.125086 83.754554
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 OHT Campus 26.125086 83.754554
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-7 100 0.05
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/PE100,PN-6 63 6.29
2 HDPE/PE100,PN-6 75 0.64
3 HDPE/PE100,PN-6 90 0.83
4 HDPE/PE100,PN-6 110 0.696
5 HDPE/PE100,PN-6 140 0.663
6 HDPE/PE100,PN-6 160 0.012
HSC Connection
Sno. Total Nos.
1 244
Other Details
2.31
2.13
1.67
06-Jul-2023
26-Nov-2024