| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20035487 | Name of Scheme: Chormara Kamalpur | No. of Villages: 6 | No. of Habitation Covered: 12 |
| Total Population Covered: 4442 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 17-Feb-2024 | Actual Date of Completion (Capex): 22-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 28.2 / 36.82 | Chormara Kamalpur | 26.41295979 | 82.37835917 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump -1 | 950 LPM | Chormara Kamalpur | 26.41295979 | 82.37835917 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 250 KL / 16 mtr | Chormara Kamalpur | 26.41295979 | 82.37835917 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 200 | 18 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 | 63 | 16.753 | |
| 2 | HDPE PN-6 | 75 | 0.598 | |
| 3 | HDPE PN-6 | 90 | 1.75 | |
| 4 | HDPE PN-6 | 110 | 3.544 | |
| 5 | HDPE PN-6 | 140 | 1.33 | |
| 6 | HDPE PN-6 | 160 | 2.82 | |
| 7 | HDPE PN-6 | 200 | 0.08 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 641 |