| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20035943 | Name of Scheme: SANDA KHURD WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2650 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-Oct-2023 | Actual Date of Completion (Capex): 02-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | MSERW Plain Pipe DIA-200MM | 36.77 | SANDA KHURD | 27.203752 | 83.76057 |
| 2 | MSERW Plain Pipe DIA-150MM | 27 | SANDA KHURD | 27.203752 | 83.76057 |
| 3 | MSERW SLOTTED PIPE DIA-150MM | 16 | SANDA KHURD | 27.203752 | 83.76057 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 35.99/37 | SANDA KHURD | 27.203752 | 83.76057 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | ZINK-ALM OHT TANK | 175KL/12Mtr. | SANDA KHURD | 27.203518 | 83.760422 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DOUBLE FLANGED PIPE/DI | 150 | 0.0192 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6,PE-100/HDPE | 63 | 1.285 | |
| 2 | PN-6,PE-100/HDPE | 75 | 0.672 | |
| 3 | PN-6,PE-100/HDPE | 90 | 0.656 | |
| 4 | PN-6,PE-100/HDPE | 110 | 0.66 | |
| 5 | PN-6,PE-100/HDPE | 125 | 0.476 | |
| 6 | PN-6,PE-100/HDPE | 140 | 0.122 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 334 |