| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20036125 | Name of Scheme: SANDA GRAMIN PEYJAY YOJNA | No. of Villages: 3 | No. of Habitation Covered: 5 |
| Total Population Covered: 3403 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-May-2024 | Actual Date of Completion (Capex): 25-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | tube well | 24.00 m / 117.30 m | Sanda | 26.93797 | 79.839535 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump | 700 / 61 | Sanda | 26.93797 | 79.839535 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 /14 | Sanda | 26.93797 | 79.839535 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | .03085 | PUMP HOUSE TO OHT |
| 2 | DI | 200 | .00565 | PUMP HOUSE TO OHT |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.9303 | Distribution Network |
| 2 | HDPE | 90 | 1.5869 | Distribution Network |
| 3 | HDPE | 110 | 1.976 | Distribution Network |
| 4 | HDPE | 140 | 0.672 | Distribution Network |
| 5 | HDPE | 160 | 0.34 | Distribution Network |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 707 |