| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20036136 | Name of Scheme: MUGARA GRAMIN PEYJAL YOJNA | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 2707 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-May-2024 | Actual Date of Completion (Capex): 07-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TW | 24.00/156.00 | MUGARA | 79.7576867 | 26.8470449 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 600/49 | MUGARA | 79.7576867 | 26.8470449 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 175/12 | MUGARA | 79.7576867 | 26.8470449 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 80 | 0.0035 | RISING MAIN |
| 2 | DI | 100 | 0.0408 | RISING MAINS |
| 3 | DI | 150 | 0.0073 | RISING MAIN |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 3.74 | DISTRIBUTION |
| 2 | HDPE | 63 | 5.57 | DISTRIBUTION |
| 3 | HDPE | 110 | 0.48 | DISTRIBUTION |
| 4 | HDPE | 140 | 0.33 | DISTRIBUTION |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 565 |