Project Completion Certificate (Ground Water)
Scheme ID: 20036192 Name of Scheme: GADIA BALIDATPUR GRAMIN PEYJAL YOJNA No. of Villages: 3 No. of Habitation Covered: 6
Total Population Covered: 4408 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-May-2024 Actual Date of Completion (Capex): 25-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 23/79.30 GADIA BALIDATPUR 79.767499 27.129722
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump-1 900 LPM/55 M GADIA BALIDATPUR 79.767499 27.129722
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250 KL/ 18 M GADIA BALIDATPUR 79.767499 27.129722
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0163 Rising main
2 DI 150 0.0101
3 DI 200 0.0083 Rising main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 2.10 Distribution
2 HDPE 63 6.3 Distribution
3 HDPE 110 2.78 Distribution
4 HDPE 140 2.41 Distribution
5 HDPE 160 0.43 Distribution
6 HDPE 180 0.367 Distribution
7 HDPE 200 0.333 Distribution
HSC Connection
Sno. Total Nos.
1 622
Other Details
4.14
4.07
4.14
27-Jun-2024
28-Jun-2024