| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20036207 | Name of Scheme: PARSARAMAU GRAMIN PEYJAL YOJNA | No. of Villages: 2 | No. of Habitation Covered: 5 |
| Total Population Covered: 3850 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-May-2024 | Actual Date of Completion (Capex): 10-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 22.00/118.83 | PARSARAMAU | 79.736365 | 26.952112 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump-1 | 800 LPM/61 M | PARSARAMAU | 79.736365 | 26.952112 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 225 KL/ 14 M | PARSARAMAU | 79.736365 | 26.952112 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.197 | Rising main |
| 2 | DI | 150 | 0.0077 | Rising main |
| 3 | DI | 200 | 0.0056 | Rising main |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.37 | Distribution |
| 2 | HDPE | 63 | 6.77 | Distribution |
| 3 | HDPE | 110 | 1.26 | Distribution |
| 4 | HDPE | 140 | 1.61 | |
| 5 | HDPE | 160 | 0.472 | Distribution |
| 6 | HDPE | 200 | 0.859 | Distribution |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 764 |