Scheme ID: 20036207 Name of Scheme: PARSARAMAU GRAMIN PEYJAL YOJNA No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 3850 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-May-2024 Actual Date of Completion (Capex): 10-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 22.00/118.83 PARSARAMAU 79.736365 26.952112
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump-1 800 LPM/61 M PARSARAMAU 79.736365 26.952112
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL/ 14 M PARSARAMAU 79.736365 26.952112
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.197 Rising main
2 DI 150 0.0077 Rising main
3 DI 200 0.0056 Rising main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.37 Distribution
2 HDPE 63 6.77 Distribution
3 HDPE 110 1.26 Distribution
4 HDPE 140 1.61
5 HDPE 160 0.472 Distribution
6 HDPE 200 0.859 Distribution
HSC Connection
Sno. Total Nos.
1 764
Other Details
3.55
3.48
3.55
14-Feb-2025
15-Feb-2025