Project Completion Certificate (Ground Water)
Scheme ID: 20036243 Name of Scheme: BAUTHAM GRAMIN PEYJAL YOJNA No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 3988 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-May-2024 Actual Date of Completion (Capex): 10-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.35/134.45 BAUTHAM 79.470661 26.983277
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump-1 850 LPM/63 M BAUTHAM 79.470661 26.983277
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 250 KL/ 16 M BAUTHAM 79.470661 26.983277
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0303 Rising main
2 DI 150 0.0075 Rising main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 3.29 Distribution
2 HDPE 63 8.42 Distribution
3 HDPE 110 2.43 Distribution
4 HDPE 140 1.67 Distribution
5 HDPE 160 0.258 Distribution
HSC Connection
Sno. Total Nos.
1 726
Other Details
3.75
3.88
3.95
13-Jul-2024
14-Jul-2024