Project Completion Certificate (Ground Water)
Scheme ID: 20036300 Name of Scheme: KHIRIYA GRAMIN PEYJAL YOJNA No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 4841 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-May-2024 Actual Date of Completion (Capex): 25-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 26 M / 125.30 KHIRIYA 79.5949321 27.0533571
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE PUMP - 01 950 LPM / 59 M KHIRIYA 79.5949321 27.0533571
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT- 01 275N KL / 12 M KHIRIYA 79.5949321 27.0533571
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 125 0.0245
2 DI 150 0.007 rising mains
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 11.411
2 HDPE 90 4.30.36
3 HDPE 110 1.1954
4 HDPE 140 3.2324
5 HDPE 160 0.0542
HSC Connection
Sno. Total Nos.
1 760
Other Details
4.34
4.25
4.34
27-Jun-2024
28-Jun-2024