| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20036477 | Name of Scheme: SAKARBABA & TILAK SARAI & BHAWANI SARAI | No. of Villages: 3 | No. of Habitation Covered: 8 |
| Total Population Covered: 6110 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-May-2024 | Actual Date of Completion (Capex): 25-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell-1 | 15.06 M / 63.24 M | SAKARBARA BAGHULAI-1 | 27.001911 | 79.642167 |
| 2 | Tubewell-2 | 15.00 M / 69.30 M | SAKARBARA BAGHULAI-2 | 27.001911 | 79.642167 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 625 LPM / 72 M | SAKARBARA BAGHULAI-1 | 27.001911 | 79.642167 |
| 2 | Submersible Pump | 625 LPM / 72 M | SAKARBARA BAGHULAI-2 | 27.001911 | 79.642167 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 375 KL / 20 M | SAKARBARA BAGHULAI-1 | 27.001911 | 79.642167 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 200 | 0.006 | Pump House to OHT |
| 2 | DI | 100 | 0.5345 | Pump House to OHT |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 8.82140 | Distribution Network |
| 2 | HDPE | 90 | 5.017 | Distribution Network |
| 3 | HDPE | 110 | .92960 | Distribution Network |
| 4 | HDPE | 140 | 1.09210 | Distribution Network |
| 5 | HDPE | 200 | 2.34030 | Distribution Network |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1078 |