Project Completion Certificate (Ground Water)
Scheme ID: 20036477 Name of Scheme: SAKARBABA & TILAK SARAI & BHAWANI SARAI No. of Villages: 3 No. of Habitation Covered: 8
Total Population Covered: 6110 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-May-2024 Actual Date of Completion (Capex): 25-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell-1 15.06 M / 63.24 M SAKARBARA BAGHULAI-1 27.001911 79.642167
2 Tubewell-2 15.00 M / 69.30 M SAKARBARA BAGHULAI-2 27.001911 79.642167
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 625 LPM / 72 M SAKARBARA BAGHULAI-1 27.001911 79.642167
2 Submersible Pump 625 LPM / 72 M SAKARBARA BAGHULAI-2 27.001911 79.642167
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 375 KL / 20 M SAKARBARA BAGHULAI-1 27.001911 79.642167
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.006 Pump House to OHT
2 DI 100 0.5345 Pump House to OHT
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.82140 Distribution Network
2 HDPE 90 5.017 Distribution Network
3 HDPE 110 .92960 Distribution Network
4 HDPE 140 1.09210 Distribution Network
5 HDPE 200 2.34030 Distribution Network
HSC Connection
Sno. Total Nos.
1 1078
Other Details
6.12
5.98
6.12
27-Jun-2024
28-Jun-2024