Project Completion Certificate (Ground Water)
Scheme ID: 20036497 Name of Scheme: GOORA & MURAIYA GRAMIN PEYJAL YOJNA No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 6441 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-May-2024 Actual Date of Completion (Capex): 07-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 36.03/201.13 GOORA & MURAIYA 27.016578 79.82698
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 675/78 GOORA & MURAIYA 27.016578 79.82698
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 400/16 GOORA & MURAIYA 27.016578 79.82698
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.627 RISING MAINS
2 DI 150 0.0148 RISING MAINS
3 DI 200 0.0107 RISING MAINS
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 5.072 DISTRIBUTION
2 HDPE 63 5.460 DISTRIBUTION
3 HDPE 110 1.11 DISTRIBUTION
4 HDPE 140 0.854 DISTRIBUTION
5 HDPE 160 1.080 DISTRIBUTION
6 HDPE 180 1.68 DISTRIBUTION
7 HDPE 200 0.486 DISTRIBUTION
HSC Connection
Sno. Total Nos.
1 1160
Other Details
5.89
5.76
5.89
11-Jul-2024
12-Jul-2024