| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20036627 | Name of Scheme: RAMKHERA & SARAI GOPAL GRAMIN PEYJAL YOJNA | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 3882 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-May-2024 | Actual Date of Completion (Capex): 25-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24.01 M /96.29 M | RAMKHERA & SARAI GOPAL | 79.431884 | 27.190102 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERCIBLE PUMP | 850 LPM / 61 M | RAMKHERA & SARAI GOPAL | 79.431884 | 27.190102 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC OHT | 250 KL / 14 M | RAMKHERA & SARAI GOPAL | 79.431884 | 27.190102 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | 0.033 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 5.597 | |
| 2 | HDPE PIPE | 90 | 2.609 | |
| 3 | HDPE PIPE | 140 | 0.2865 | |
| 4 | HDPE PIPE | 160 | 1.727 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 671 |