Scheme ID: 20037230 Name of Scheme: GARINA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4765 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 06-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 31.8 Mtr / 90.76 Mtr GARINA 29.158593 77.824798
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1000 LPM / 56 Mtr GARINA 29.158593 77.824798
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 Kl / 18 M GARINA 29.158593 77.824798
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0166
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.186
2 HDPE 90 1.267
3 HDPE 110 0.320
4 HDPE 125 0.224
5 HDPE 140 0.174
6 HDPE 180 0.807
HSC Connection
Sno. Total Nos.
1 869
Other Details
3.88
3.88
3.17
25-Jun-2024
21-Jan-2025