Project Completion Certificate (Ground Water)
Scheme ID: 20037233 Name of Scheme: PACHGAON PATTI AMARSINGH No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4373 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 17-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 43.84 Mtr / 95.64 Mtr PACHGAON PATTI AMAR SINGH 28.931801 77.825997
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 950 LPM / 56 Mtr PACHGAON PATTI AMAR SINGH 28.931801 77.825997
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 Kl / 18 M PACHGAON PATTI AMAR SINGH 28.931801 77.825997
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0297
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.149
2 HDPE 90 2.166
3 HDPE 110 0.446
4 HDPE 125 0.347
5 HDPE 140 0.357
6 HDPE 160 0.134
HSC Connection
Sno. Total Nos.
1 882
Other Details
3.83
3.83
3.13
05-Jan-2025
06-Jan-2025