Project Completion Certificate (Ground Water)
Scheme ID: 20037259 Name of Scheme: NAGLI ISSA & BANA No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 5750 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 07-Jun-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 36.14 Mtr / 99.78 Mtr NAGLI ISSA & BANA 29.087758 77.829579
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1206 LPM / 56 Mtr NAGLI ISSA & BANA 29.087758 77.829579
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350 Kl / 18 M NAGLI ISSA & BANA 29.087758 77.829579
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0206
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.297
2 HDPE 90 2.335
3 HDPE 110 0.549
4 HDPE 125 0.149
5 HDPE 140 1.498
6 HDPE 160 1.309
HSC Connection
Sno. Total Nos.
1 1277
Other Details
4.81
4.81
4.03
26-Oct-2024
27-Oct-2024