Project Completion Certificate (Ground Water)
Scheme ID: 20037263 Name of Scheme: SARANPUR No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2548 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 01-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 31.21 Mtr / 94.25 Mtr SARANGPUR 28.882404 78.088268
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 550 LPM / 50 Mtr SARANGPUR 28.882404 78.088268
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHt 150 Kl / 14 M SARANGPUR 28.882404 78.088268
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0188
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.193
2 HDPE 90 0.568
3 HDPE 110 0.499
4 HDPE 140 1.318
5 HDPE 160 1.051
HSC Connection
Sno. Total Nos.
1 382
Other Details
2.72
2.72
2.15
19-Jun-2024
10-Oct-2024