| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20037263 | Name of Scheme: SARANPUR | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2548 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 01-Feb-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 31.21 Mtr / 94.25 Mtr | SARANGPUR | 28.882404 | 78.088268 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 550 LPM / 50 Mtr | SARANGPUR | 28.882404 | 78.088268 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHt | 150 Kl / 14 M | SARANGPUR | 28.882404 | 78.088268 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.0188 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.193 | |
| 2 | HDPE | 90 | 0.568 | |
| 3 | HDPE | 110 | 0.499 | |
| 4 | HDPE | 140 | 1.318 | |
| 5 | HDPE | 160 | 1.051 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 382 |