Project Completion Certificate (Ground Water)
Scheme ID: 20038186 Name of Scheme: Anesnangli Gram Panchayat Water Supply No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2371 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Nov-2022 Actual Date of Completion (Capex): 30-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 3.43
2 HDPE PIPE PN -6: CLASS PE -100 75 0.13
3 HDPE PIPE PN -6: CLASS PE -100 90 0.11
4 HDPE PIPE PN -6: CLASS PE -100 110 0.06
5 HDPE PIPE PN -6: CLASS PE -100 125 0.02
6 HDPE PIPE PN -6: CLASS PE -100 140 0.41
HSC Connection
Sno. Total Nos.
Other Details
1.86
1.86
1.61
31-Mar-2025
01-Apr-2025