Project Completion Certificate (Ground Water)
Scheme ID: 20038864 Name of Scheme: Karimnangar Urf Uleda Gram Panchayat Water Supply No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2914 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Feb-2026 Actual Date of Completion (Capex): 01-May-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WEELL 15 M/121.48 M Karimnangar Urf Uleda 29.243652 78.20307
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 12.5 HP 550 LPM/40 M Karimnangar Urf Uleda 29.243652 78.20307
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175kl/16m Karimnangar Urf Uleda 29.243652 78.20307
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 63 9.74
2 HDPE PIPE PN-6: CLASS PE-100 75 0.57
3 HDPE PIPE PN-6: CLASS PE-100 90 0.44
4 HDPE PIPE PN-6: CLASS PE-100 110 0.41
5 HDPE PIPE PN-6: CLASS PE-100 125 0.88
6 HDPE PIPE PN-6: CLASS PE-100 140 0.72
7 HDPE PIPE PN-6: CLASS PE-100 200 0.45
HSC Connection
Sno. Total Nos.
1 475
Other Details
2.55
2.55
2.19
31-Jul-2025
01-Aug-2025