| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20039185 | Name of Scheme: NAUBANA JJM SCHEME | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 4265 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 15-May-2024 | Actual Date of Completion (Capex): 19-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30/120 | Naubana | 28.261725 | 80.925018 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 930/39 | Naubana | 28.262133 | 80.925123 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250/12 | Naubana | 28.2615901 | 80.9249936 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe | 150 | 0.022 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe | 63 | 10.207 | |
| 2 | HDPE Pipe | 75 | 0.571 | |
| 3 | HDPE Pipe | 90 | 1.770 | |
| 4 | HDPE Pipe | 110 | 0.753 | |
| 5 | HDPE Pipe | 140 | 0.460 | |
| 6 | HDPE Pipe | 160 | 1.534 | |
| 7 | HDPE Pipe | 200 | 0.167 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 643 |